welcome to or store


25MM Multi-rotor the CNC aluminum boom clip 5pc


$20.58

Add to Cart:


  • Description
  • Details
  • Reviews
  • offthegridsun info
Features -DIYers can assemble your own multi-rotor aircrafts with this arm clamps, it suit for not only small size entertainment purpose multi-rotor, but also large scale commercial aerial photography multi-rotor aircrafts. -New design makes it lighter in weight. -25MM,22MM,20MM,16MM,15MM,14MM,12MM Multi-rotor the CNC aluminum Boom clip 5 clamp each. Ask for the size you need. Product Details D25mm CNC Super Light Multi-rotor Arm Clamps/Tube Clamps - Black Suit for tube diameter: 25mm Screw diameter: Φ2.5mm (12.9 class high strength) Screw length: 38mm Weight: 8.8g each (including screw and nut) -12mm aluminum tubes folder: Each 2g, four-axis 16 sets = 32g, six-axis 24 sets = 48g; -14mm aluminum tubes folder: Each set of 16 sets = 80g 5g, four-axis, six-axis 24 sets = 120g; -15mm aluminum tubes folder: Each 4.8g, four-axis 16 sets = 76.8g, six-axis 24 sets = 115.2g; -16mm aluminum tubes folder: Each 4.7g, four-axis 16 sets = 75g, six-axis 24 sets = 113g; -20mm aluminum tube clip: the each set 7g, four-axis 16 sets = 112g 24 sets of six-axis = 168g; -22mm aluminum tubes folder: Each 6.6g, four-axis 16 sets = 105g, six-axis 24 sets = 158g; -25mm aluminum clip: Each 7.7g, four-axis 16 sets = 122g 24 sets of six-axis = 185g; Four axes: 2X4 = 8 sets of the fixed fuselage center board, need 2x4 = 8 sets of fixed motor base, that is a set of four-axis rack requires a total of 16 sets of aluminum mounting base. Six-axis: the corresponding six-axis (2 +2) x6 = 24; If the assembly is a three-axis up and down six motors, but also need 12 sets of motor mounting plate to 6 (with three); similar four-axis assembly 8 motor, 16 sets of aluminum mounts, eight motor mounting plate.
 


25MM Multi-rotor the CNC aluminum boom clip 5pc
 

25MM Multi-rotor the CNC aluminum boom clip 5pc
25MM Multi-rotor the CNC aluminum boom clip 5pc
 

  • 999 Units in Stock

Be the first to write a review.  Write a Review.

The NEW Small UAS Rule (Part 107), including all pilot and operating rules, will be effective in August 2016. For more detailed information, please see:

Need more information? Read about how to fly a UAS for your work or business.


This product was added to our catalog on Monday 29 April, 2013.

Content

Custom Left Slide Out

You can add any content here, text, images, etc.



your alt text here